The existing oval was once upon a time a tip site. The new oval construction required substantial compaction worksconducted by the RIC compactor. A machine there are only very little of worldwide. Large amounts of soil wererequired to re fill the holes created. The next phase of compaction involved a large square drum impact roller to ensure all areas of the field met compaction requirements.
The other scope of works involved:
- Demolition of existing infrastructure and oval stripping
- Cut/fill leveling works
- Irrigation
- MegaFlo drainage
- Perimeter fencing encased into concrete spoon drain
-Synthetic pads
-Sand layer
-Turfing