Tally Ho Reserve

Built on a Melbourne Water retarding basin, a new oval was constructed to facilitate soccer and cricket. An intensive drainage system is a part of the project with sand slitting to commence November 2022.

The overall scope included:

- Demolition of existing infrastructure and oval stripping
- Cut/fill leveling works
- Construction of a new cricket pitch
- Irrigation
- Drainage
-Turfing
-Sand Slitting

IMG_2387
Scroll to Top
Call Now Button